Project Type
Backup Power
Project Owner
ExxonMobil-Sabic GCGV
General Contractor
Harvey-Cleary
Electrical Contractor
FSG Corpus Christi

ExxonMobil Polyethylene Plant | Emergency Power Gregory Portland, Texas

Case Study
FSG Provides Backup Power Installation Service for Major New Texas Gulf Coast Plastics Plant

Challenge

As part of the design-build project wrapping up at the new ExxonMobil-Sabic GCGV polyethylene plant just north of Corpus Christi, Texas, General Contractor Harvey-Cleary needed an electrical contractor to provide installation, testing, and commissioning services for a new Cummins 1 Megawatt Tier 4 stationary prime generator set that would provide emergency power for the facility. With all eyes on this very high-profile project, Harvey-Cleary turned to FSG's Corpus Christi branch.

Solution

FSG's onsite Project Manager met with owner representatives and the GC to determine what special requirements might apply to the project. At the owner's insistence, a Lift Plan was required before moving and placing the new 25,000-pound generator set on its pad with a Liebherr 1090 crane. FSG coordinated with local contractor TNT Crane and Rigging to deliver the Lift Plan, which was reviewed and approved by the project owner and the GC.

Following the placement of the new generator set on its pad site, FSG began the process of installing all feed lines and connections between the generator, the 1,600-amp switchgear, and the associated load bank. All installation work was followed by a complete system commissioning that resulted in the final delivery of the genset to the project owner in perfect working order.

Result

FSG's Corpus Christi branch once again demonstrated that for high-visibility projects, there is no better choice for electrical contractors on the lower Texas Gulf Coast. Harvey-Cleary was pleased with the service provided by FSG, as was the project owner, who at the time of the installation project was trying to maintain an impressive safety record that had held up throughout the massive, multi-year plant construction project.

FSG projects consistently deliver excellence for our  customers, for our employees, and for the communities we serve.

We see each project as an opportunity to embrace our mission and provide superior value through quality products, service, and support.

Let's Talk

Fill out the form and we’ll schedule a call to talk through a custom solution for you.

Or call us at
888-215-1336