FSG provided complete LED lighting upgrade services.

Challenge

Fort Dix, the common name for the Army Support Activity located at Joint Base McGuire-Dix-Lakehurst, is a United States Army post. FSG won a contract to upgrade the lighting at the main exchange.

Solution

Over 1,000 existing T8 recessed fluorescent light fixtures were upgraded to new recessed LED troffers. Additionally 12 HID high bay fixtures were also converted to LED high bays.

Result

The base was impressed with FSG's high installation quality control. Ralph Fox, the electrical designer commented that FSG and their crew were amazing to work with on this project both in the office and the installation crew. According to Fox, "The store looks very good and the installation workmanship is very professional. FSG's installation and overall professionalism during the project were very refreshing. While there were lots of potential problems that might have bogged down this project, FSG took the lead to ensure that everyone was kept well-informed of how things were going and what they needed to succeed."

FSG projects consistently deliver excellence for our  customers, for our employees, and for the communities we serve.

We see each project as an opportunity to embrace our mission and provide superior value through quality products, service, and support.

Let's Talk

Fill out the form and we’ll schedule a call to talk through a custom solution for you.

Or call us at
888-215-1336