Contract Amount
$387,825.00
Project Type
Lighting Retrofit
Project Owner
The Port Authority of NY and NJ
Cost Savings
$66,172 a year
Fixtures Replaced
628
Annaul KwH Reduced
413,652 kWh a year
General Contractor
Constellation Energy
Electrical Contractor
Port Authority Electrical

PANYNJ: Outerbridge Perth Amboy, New Jersey

Case Study
FSG designed an LED lighting retrofit that included both cobra head and high mast roadway lighting

Challenge

One of the firsts" in the Port Authority legacy

Solution

the Outerbridge Crossing was built as part of an overall project to accommodate greatly increased interstate automobile traffic following World War I. The Outerbridge Crossing and the Goethals Bridge

Result

which are similar in design

More Information

were the first facilities constructed by the Port Authority. The 143-foot channel clearance of the Outerbridge Crossing permits passage of deep-sea vessels through the Arthur Kill. As part of a contract to update lighting on several PANYNJ locations

FSG projects consistently deliver excellence for our  customers, for our employees, and for the communities we serve.

We see each project as an opportunity to embrace our mission and provide superior value through quality products, service, and support.

Let's Talk

Fill out the form and we’ll schedule a call to talk through a custom solution for you.

Or call us at
888-215-1336