- Contract Amount
- $387,825.00
- Project Type
- Lighting Retrofit
- Project Owner
- The Port Authority of NY and NJ
- Cost Savings
- $66,172 a year
- Fixtures Replaced
- 628
- Annaul KwH Reduced
- 413,652 kWh a year
- General Contractor
- Constellation Energy
- Electrical Contractor
- Port Authority Electrical
PANYNJ: Outerbridge Perth Amboy, New Jersey
Case Study
FSG designed an LED lighting retrofit that included both cobra head and high mast roadway lighting
Challenge
One of the firsts" in the Port Authority legacySolution
the Outerbridge Crossing was built as part of an overall project to accommodate greatly increased interstate automobile traffic following World War I. The Outerbridge Crossing and the Goethals BridgeResult
which are similar in designMore Information
were the first facilities constructed by the Port Authority. The 143-foot channel clearance of the Outerbridge Crossing permits passage of deep-sea vessels through the Arthur Kill. As part of a contract to update lighting on several PANYNJ locationsFSG projects consistently deliver excellence for our customers, for our employees, and for the communities we serve.
We see each project as an opportunity to embrace our mission and provide superior value through quality products, service, and support.
Let's Talk
Fill out the form and we’ll schedule a call to talk through a custom solution for you.
Or call us at
888-215-1336