- Contract Amount
- $69,297.00
- Project Type
- Lighting Retrofit
- Project Owner
- The Port Authority of NY and NJ
- Cost Savings
- $8,214.00
- Fixtures Replaced
- 381
- General Contractor
- Honeywell
- Electrical Contractor
- Facility Solutions Group, Inc
PANYNJ: Port Authority Bus Terminal Orange County, New York
Case Study
Lighting upgrade of Parking Garages, lots and adjacent structures.
Challenge
Stewart International Airport, officially New York Stewart International Airport is a public/military airport in Orange County, New York, United States. Developed in the 1930s as a military base to allow cadets at the nearby United States Military Academy at West Point to learn aviation, it has grown into the major passenger airport for the mid-Hudson region. FSG upgraded lighting in several spaces, including maintenance areas, offices and on the exterior of the building.Solution
T12 Fluorescent fixtures in offices, shops and back of house were upgraded to new T8 lamps, electronic ballasts and in some cases reflectors. High bay HID fixtures in maintenance bays were upgraded to new fluorescent high bays with sensors. Exterior HID flood and wallpack fixtures were upgraded to new LED fixtures.Result
The new lighting system reduced energy consumption while improving overall lighting at the site. Lamp life on exterior fixtures increased 400%, greatly reducing maintenance costs.FSG projects consistently deliver excellence for our customers, for our employees, and for the communities we serve.
We see each project as an opportunity to embrace our mission and provide superior value through quality products, service, and support.
Let's Talk
Fill out the form and we’ll schedule a call to talk through a custom solution for you.
Or call us at
888-215-1336