What FSG Smart Building Deployment includes
FSG Smart Buildings manages the full deployment lifecycle from initial assessment through final commissioning. Every phase is coordinated internally so nothing falls through the cracks between planning and go-live.
- Site Assessment and Planning FSG evaluates your existing infrastructure, identifies integration requirements, and builds a deployment plan tailored to your building or portfolio before any equipment is ordered.
- In-House Panel Fabrication FSG fabricates UL 508A-certified control panels in-house. Shorter lead times, tighter quality control, no third-party delays.
- Installation and Integration FSG field teams handle installation and system integration on-site following standardized procedures to ensure consistent performance across every location.
- Phased Rollout Coordination For national portfolios, FSG sequences deployments by region and manages scheduling centrally. Pilot locations are validated before full rollout begins.
- Commissioning and Handoff Every deployment is fully commissioned before handoff. No exceptions. See below for what that process includes.
Deployment Without Commissioning Is Just Installation
Commissioning is the verification phase that confirms every system is functioning exactly as designed before your team takes ownership. It is the difference between a completed installation and a system that actually performs.
FSG commissions every deployment before handoff. That includes:
- Full end-to-end testing of all connected systems
- Verification of setpoints, schedules, and control sequences
- Remote commissioning capability to reduce site visit requirements
- Documentation of system performance at go-live
Nothing gets handed off until it is 100% verified. For national portfolios where inconsistent commissioning across sites compounds quickly into performance problems, that standard matters.
A Clear Plan for Centralized Building Control.
Assess & Align
We evaluate your existing controls, infrastructure, and operational priorities to identify integration opportunities and gaps, before a single controller is ordered.
Design & Integrate
We build a centralized platform tailored to your building or portfolio, connecting HVAC, lighting, and critical systems using open-architecture technology that doesn't lock you in.
Deploy & Commission
Our team manages the full deployment, including in-house fabricated control panels, phased rollout coordination, and 100% verified commissioning before handoff.
Monitor & Optimize
Ongoing visibility, real-time alerts, and system tuning, with dedicated account management to keep performance aligned with your business goals long after go-live.
Steve Sparling, VP of Smart Buildings, FSG
FSG Smart Buildings is your complete source for building automation systems, service, and support.
Discovery
We start with informed hypotheses that cover every angle of your portfolio.
Pilot Projects
Rigorous testing gives us real-world validation before scaling our solutions.
National Installs
Fast rollouts at thousands of locations with minimum disruption to operations.
Easy Access
Chariot®, the online window into your entire portfolio, accessible from anywhere.
Monitor & Maintain
Truck rolls kept to a minimum through remote troubleshooting and proactive maintenance.
24/7 Support
When service is required, count on us for fast, accurate fixes from US-based techs.
Ready to start your next deployment?
Whether you are deploying across one building or rolling out nationally, FSG manages the process from assessment through commissioning so your team can focus on running the business.
Or call us at
Frequently Asked Questions
Have a question? Here are some of the most frequently asked questions of our team.