North Texas Municipal Water District
PROJECT TYPE
Electrical Construction
GENERAL CONTRACTOR
Garney
ELECTRICAL CONTRACTOR
FSG
FSG installed four 1,500hp Variable Frequency Drives to supply power to the pipeline's Raw Water Pumps.
Executive Summary
To address drought and invasive zebra mussels, the North Texas Municipal Water District built a new water pipeline from Lake Texoma. Working closely with the district, our North Texas electrical team installed 1,500hp VFDs, emergency generators, switchgear, and new distribution lines. This infrastructure, paired with a SCADA system and fiber network, enables automated chemical treatment and reliable water delivery for the Wylie WTP—now one of the largest ozonated water treatment facilities in the U.S.
Project Highlights
- Delivered an electrical construction package empowering North Texas to pump raw water from Lake Texoma to the Wylie Treatment Plant
- Installed four 1,500 hp VFDs, 4,160 V switchgear, three emergency generators, 25 kV distribution lines, and five new electrical buildings
- Enabled operational automation with fiber-optic network, SCADA system, and flow metering for precise chemical dosing
Sunbelt Rentals
IndustrialSunbelt Rentals
FSG Delivers National Solar Rollout for Sunbelt Rentals, Supporting Sustainability Goals Across Hundreds of Branch Locations
Circle K
RetailCircle K
FSG Provides Seamless Remote Control and Monitoring of Key Store Energy and Performance Variables for Circle K
ULTA Beauty | Smart Buildings
RetailULTA Beauty | Smart Buildings
FSG Solves Facility Maintenance and Repair Challenges for National Retail Chain with EMS Solution
FSG projects consistently deliver excellence for our customers, for our employees, and for the communities we serve.
We see each project as an opportunity to embrace our mission and provide superior value through quality products, service, and support.
Let's Build Together.
FSG delivers safe, efficient, and future-ready electrical solutions for projects of every size. Let’s build smarter, together.