Packer Avenue Marine Terminal
PROJECT TYPE
Energy Efficiency Project
GENERAL CONTRACTOR
Facility Solutions Group (FSG)
ELECTRICAL CONTRACTOR
Hatzel Buhler
FIXTURES REPLACED
288
FSG and Holophane upgraded Greenwich Marine Terminals with 288 LED fixtures and smart controls, cutting lighting load by over 50% while enabling future IoT integration.
Executive Summary
Greenwich Marine Terminals wanted to integrate IoT equipment with its lighting infrastructure. FSG and Holophane designed and installed 24 new poles with lowering devices and 288 LED fixtures, reducing the overall lighting load by more than 50%. Advanced lighting controls further improve energy efficiency, while the new system provides a flexible platform for future IoT applications.
Project Highlights
- Delivered a LED lighting modernization at Packer Avenue Marine Terminal
- Replaced 24 light poles with lowering devices and installed 288 new LED fixtures outfitted with power and communication cabling
- Reduced lighting load by over 50%, extended fixture life fivefold, and enabled per-fixture control with Acuity ROAM wireless system
Circle K
RetailCircle K
FSG Provides Seamless Remote Control and Monitoring of Key Store Energy and Performance Variables for Circle K
ULTA Beauty | Smart Buildings
RetailULTA Beauty | Smart Buildings
FSG Solves Facility Maintenance and Repair Challenges for National Retail Chain with EMS Solution
185 Broadway
Business Services185 Broadway
FSG’s electrical expertise supports high-rise performance at the iconic 185 Broadway redevelopment.
FSG projects consistently deliver excellence for our customers, for our employees, and for the communities we serve.
We see each project as an opportunity to embrace our mission and provide superior value through quality products, service, and support.
Let's Build Together.
FSG delivers safe, efficient, and future-ready electrical solutions for projects of every size. Let’s build smarter, together.