UT Health Hospital
PROJECT TYPE
Prefabrication
Propel Prefabrication finds creative way to work around labor shortage while still delivering top-quality products and services.
Executive Summary
Facing an industry-wide labor shortage, our San Antonio team’s prefab shop supported the project by assigning routine, non-critical electrical tasks to apprentices under the supervision of a Master Electrician and a strict quality control program. This approach kept the project on schedule and developed future full-time, certified technicians for FSG.
Project Highlights
- Utilized Propel Prefabrication to offset labor shortages, enabling assembly of electrical components off-site by apprentices supervised by master electricians
- Prefabricated overhead conduit racks and entire electrical rooms for in-field “plug-and-play” installation
- Maintained project momentum and met schedule milestones despite labor constraints through innovative prefabrication methods
Sister Grove Wastewater Plant | Emergency Power
Sister Grove Wastewater Plant | Emergency Power
FSG Installs Three 3,250kW Backup Generators at Sister Grove Wastewater Treatment Plant North of Dallas
UT Tyler | Emergency Power
EducationUT Tyler | Emergency Power
FSG Installs Emergency Power Genset as Part of Electrical Construction Work Scope
Bridgeland High School | Emergency Power
EducationBridgeland High School | Emergency Power
FSG Delivers Seamless Backup Power for New Flagship High School Facility
FSG projects consistently deliver excellence for our customers, for our employees, and for the communities we serve.
We see each project as an opportunity to embrace our mission and provide superior value through quality products, service, and support.
Let's Build Together.
FSG delivers safe, efficient, and future-ready electrical solutions for projects of every size. Let’s build smarter, together.
"*" indicates required fields