WaWa, Inc.
PROJECT TYPE
Energy Efficiency Project
ELECTRICAL CONTRACTOR
Facility Solutions Group (FSG)
COST SAVINGS
$1,200,000.00/Year
FIXTURES REPLACED
10,000
FSG performed a multi-site LED retrofit for WAWA convenience stores
Executive Summary
Wawa was seeing its utility budget increasing between 12 and 15 percent over each of the previous five years. As their national lighting contractor, Facility Solutions Group (FSG) installed 4000K Immersion LED lighting in refrigerated cooler and freezer cases in 590 locations, totaling more than 10,000 doors. Wawa has reduced refrigerated cooler/freezer electricity and maintenance expense by a combined 78 percent since its adoption of GE's Immersion LED refrigerated display lighting.
Project Highlights
- Completed a multi-location LED retrofit across 590 Wawa stores, upgrading 10,000 cooler and freezer doors
- Achieved a 78% reduction in refrigerated lighting energy and maintenance costs
- Saved Wawa $1.2 million annually with a project payback period of just 26–28 months
NewYork-Presbyterian Spine Center
HealthcareNewYork-Presbyterian Spine Center
FSG Electric New York completed the full electrical buildout for a state-of-the-art imaging and diagnostic center in The Spiral at Hudson Yards.
24-02 49th Ave
Commercial Real Estate24-02 49th Ave
FSG powered the transformation of 24-02 49th Ave into a modern, reliable, and energy-efficient office hub for Long Island City.
FSG projects consistently deliver excellence for our customers, for our employees, and for the communities we serve.
We see each project as an opportunity to embrace our mission and provide superior value through quality products, service, and support.